How many pouches per pour?
Enter your pipeline length. We use the coverage printed on each pouch.
As printed on the pack: one 200 g pouch primes up to 25 m, one 250 g pouch up to 30 m, each mixed in 75 L of water. Prime before every pour.
- Primes the pump line
- Saves cement bags
- 1 pouch in 75 L water
- For line & boom pumps
- Does not affect the concrete*
- Prepaid · free delivery
One small pouch, printed on the pack
The numbers on every BuildingShop pump primer pouch.
- 75 Lof water per pouch
- 30 mof pipeline per 250 g pouch
- 25 mof pipeline per 200 g pouch
- 3+ bagsof cement saved per 250 g pouch
As printed on the BuildingShop pouches: 200 g pouch primes up to 25 m and saves more than 2.5 bags of cement; 250 g pouch primes up to 30 m and saves more than 3 bags. Mix one pouch in 75 litres of water.
Mix it in three steps
As printed on the pouch.
1. Water
Take 75 litres of water in a drum or in the pump hopper.
2. One pouch
Add one pouch and mix until a greasy slurry forms.
3. Pump it through
Pass the slurry through the pipeline before concreting, then start pumping concrete.
Drag to compare
The first concrete decides the whole pour
A dry steel pipeline pulls the cement paste out of the first concrete. The mix stiffens, the line chokes and the crew opens clamps and hammers pipes while the transit mixer waits.
A primer slurry coats the inside of the line first, so the concrete behind it slides through.
Pump primer: straight answers
What operators ask before switching from cement slurry.
MythPrimer weakens the concrete.
FactThe pouch states the slurry does not affect the concrete. Discharge the first slurry as per your site engineer's practice, as you would with cement slurry.
MythCement slurry is cheaper.
FactEach pouch replaces more than 2.5 bags (200 g) or 3 bags (250 g) of cement used for priming, as printed on the pack.
MythOne pouch primes any length of line.
FactOne 200 g pouch covers up to 25 m, a 250 g pouch up to 30 m. Longer lines need more pouches – use the calculator.
Myth200 g and 250 g are different products.
FactSame primer, different pouch size. Pick the one that matches your usual line length.
MythOnly boom pumps need priming.
FactAny concrete pump pipeline is primed before concreting – line pumps and boom pumps alike.
Primer pouch vs cement slurry vs no priming
Cement slurry works – it just costs bags of cement every pour.
| Feature | Recommended
BuildingShop primer pouch
|
Cement-bag slurry |
No priming |
|---|---|---|---|
| Primes the pipeline | ✓ | ✓ | ✕ |
| Cement used for priming | None | 2.5–3+ bags | None |
| What you carry to site | One small pouch | 50 kg cement bags | – |
| Mixing | Pouch in 75 L water | Open, empty and mix bags | – |
| Risk of choking at the start | Lower | Lower | High |
Pouch size and pack
200 g pouches in packs of 5–50, 250 g pouches in packs of 20–100. Use the switcher to change pouch size.
How the primer works
Prime, pump, pour – without choking the line.
Product details
Prime the pipeline, not with cement bags
A dry steel pump line grabs the cement out of the first concrete that enters it. The mix stiffens, the line chokes, and the crew ends up opening clamps and hammering pipes while the transit mixer waits. The usual fix – emptying bags of cement into the hopper to make a priming slurry – costs money every single pour.
One BuildingShop pump primer pouch mixed in water makes a slippery, greasy slurry that coats the inside of the pipeline so the concrete behind it slides through. As printed on the pack: one 250 g pouch primes up to 30 m of concrete pump pipeline and saves more than 3 bags of cement at site.
How to use (as printed on the pack)
- Take 75 litres of water in a drum or in the pump hopper.
- Add one pouch and mix until a greasy slurry forms.
- Pass this slurry through the pump pipeline before concreting, then start pumping concrete.
Why sites use it
- Smooth start – helps stop blockages in the line at the start of the pour.
- Saves cement – one small pouch instead of bags of cement slurry.
- Saves time – mixed in minutes, no cement dust or extra labour.
- Does not affect the concrete (as stated on the pack).
- For line pumps and boom pumps on house slabs, apartments and RMC jobs.
Available in packs of 20, 50 and 100 pouches of 250 g. Also see the other pouch size using the switcher above.
| Brand | BUILDINGSHOP |
|---|---|
| Type | Concrete pump pipeline primer & lubricant (powder) |
| Pouch size | 250 g |
| Packs | packs of 20, 50 and 100 pouches |
| Mix | 1 pouch in 75 litres of water |
| Primes | Up to 30 m of pipeline per pouch (as printed on pack) |
| Cement saved | More than 3 bags per pouch (as printed on pack) |
| Used with | Concrete line pumps, boom pumps, RMC pumping |
How do I use the pump primer?
Take 75 litres of water in a drum or the pump hopper, add one pouch, mix until a greasy slurry forms and pass it through the pipeline before you start pumping concrete.
How many pouches do I need?
As printed on the pack, one 250 g pouch primes up to 30 m of pipeline. For longer lines use one pouch for every 30 m. Use the calculator on this page.
200 g or 250 g – what is the difference?
Both are the same primer. A 200 g pouch primes up to 25 m of pipeline, a 250 g pouch up to 30 m (as printed on each pack). Pick the size that matches your usual line length.
Does it affect the concrete?
The pack states the slurry does not affect the concrete. As with any priming slurry, follow your site engineer's practice for discharging the first slurry.
When should I prime?
Before concreting starts – every time you begin pumping through the pipeline.
How many bags of cement does it save?
As printed on the pack, one 250 g pouch saves more than 3 bags of cement that would otherwise be used to make priming slurry.
How do I pay? Is cash on delivery available?
Prepaid only – UPI, debit/credit cards and net banking. Cash on delivery is not available.
Free delivery across India. Most orders reach you in 3–7 working days, depending on your pincode.
Payment: prepaid only – UPI, debit/credit cards and net banking. Cash on delivery is not available.
Bulk or GST invoice? Message us on WhatsApp before ordering.
Complete your slab
PP fibre for the concrete, shuttering tape for the joints, a rebar tying tool and a tarpaulin for curing.
Running a pump or RMC fleet? Get fleet pricing
Pump operators and RMC plants get special rates on 50 and 100 pouch packs.
- Volume pricing on 50 × 200 g and 100 × 250 g packs
- GST invoice for your business
- Regular dispatch for running sites

Customers also viewed
Concrete Pump Primer (Slurry Pouch) – 250 g Pouches, Primes up to 30 m Pipeline | Packs of 20, 50, 100
From
Sale price
Rs. 929
Regular price
Rs. 1,859









